Jumat, 20 Juli 2018

WPP ENERGY – BACKED ASSET GREEN ENERGY TOKEN

WPP ENERGY – BACKED ASSET GREEN ENERGY TOKEN

This platform is being created to reduce the cost of green energy to most parts of the world by transmitting power production data from wholesale renewable energy producers around the world into the platform. WPP Energy’s own surplus global energy production will also be captured in the platform and made available for purchase.

About WPP

GOVERNMENT SIGNED CONTRACTS. WPP’s existing renewable energy contracts with various governments around the world, valued at over $50B, starting with an initial focus on $6B USD starting in December 2018.
WPP ENERGY has signed contracts with numerous countries around the world on a federal government level for the production of green energy for a continuous 35 year period. The contracts include PPA’s (Power Purchase Agreements) converting MSW (Municipal Solid Waste) into electricity and into by products that will be used for local markets.
WPP’s signed government contracts business is ever expanding and will include upcoming announcements in several areas including the future creation of entire green villages and cities to house up to 200,000 people, constructed in just two years, and vertical agricultural greenhouse towers.
WPP ENERGY will deploy the most powerful advanced technologies globally assisting second and third world countries to have new opportunities to address their considerable housing and energy problems. WPP is taking a major step by contributing a percentage of overall WPPCOIN profits to facilitate an increase in power production as a humanitarian aid to countries with the greatest needs.

WPP ENERGY’S TWO DIGITAL PLATFORMS:

GLOBAL GREEN ENERGY PLATFORM will be deployed in late Q3 2018 to capture power production data from Green Energy producers around the world. The Green Energy Producers participating in the platform are ready to provide power at wholesale prices to those institutions and private consumers seeking clean power production around the world at reduced prices from traditional prices. WPP’s own global power production data will also be streamed into the platform.
This platform will change the power generation industry for the benefit of consumers and suppliers both, as the WPP Platform will capture this supply via data transmission to the platform. Data transmitted to the platform will include the type of energy produced, the amount of energy available, the price of the energy and its location.
The deployment of the new Global Green Energy Platform will enable our ability to reduce the cost of green power production for the User.
WPP EXCHANGE PLATFORM will be deployed in Q4 2018 and will aggregate the various Energy and Crypto Mining Cryptocurrencies in the marketplace into a new exchange platform. This will increase liquidity for all participants in the platform by allowing the various currencies to trade against one another as well as energy.

DISRUPTIVE GREEN ENERGY TECHNOLOGY SOLUTIONS.

ADVANCED HHO TECHNOLOGIES. The upcoming release of three advanced game changing disruptive energy technology solutions will solve many energy problems around the world:
WPP ENERGY MOBILE POWER STATION. WPP has a solution under development that will produce 1 to 2.5MW of energy per hour. This stand-alone Power Station requires only a water line hook-up and can be delivered anywhere in the world . This product will demonstrate WPP’s market leadership to help solve a massive energy crisis by using WPP’s existing proven technology to establish WPP as the world’s preferred power supply source for cryptocurrency miners, delivering a variety of clean and inexpensive power solutions to the doorstep of small, medium and large mining operations. Power demand projections from cryptocurrency mining will fuel exponential demand for WPP’s clean affordable energy solutions, reducing mining costs to a fraction of what they currently are now and with a zero-carbon footprint.
HHO CLEAN ENERGY CONVERSION OF POLLUTING COAL, OIL, NATURAL GAS AND GASOLINE POWER PLANTS. WPP has a solution under development that will convert polluting power producers into efficient low cost green energy producers. WPP business plan includes converting to clean HHO energy as many as possible of the world’s 20,000+ polluting Coal, Oil, Natural Gas and Gasoline Power Plants. WPP has a total solution to clean up this industry, greatly reducing operating costs and increasing Power Plant efficiency, while significantly reducing the costs of energy production.
HHO HOME UNITS COMPLETE ENERGY SOLUTION. WPP has a solution under development that will provide a complete power supply that will typically pay for itself in under two years, Adopters of this technology will thus be free of power bills in a short period of time and will no longer need their utility company’s energy.

TOKEN SALE DETAILS

WPP TOKEN TOTAL SUPPLY: 5 Billion Tokens
Private Sale Price: $0.16
Pre ITO Sale Price: $0.20
Pre ITO Sale Terms: flat rate that does not change over the 62 days, commencing July 15th and ending 62 days later on September 15th.

TOKEN DISTRIBUTION:

Token Sale: 50%
Founders / Management / Operations: 20%
WPP Reserve: 5%
R&D Team(s): 5%
Cryptocurrency Green Energy Rebate & Sweepstakes Programs: 10%
Marketing: Referral/Bounty/ Rewards/Community Growth: 10%

ROADMAP

WPP Energy In Business Since 1972
In 1972 WPP President, Mr. Rafael Ben became concerned about the energy and fuel futures of the U.S. and began working on researching alternate fuel technology. He was the fist person to use alcohol blends during this period and when he wrote “Methanol – A Clean Fuel for the 21st century”.
BIOMASS & GASIFICATION R&D 1986
WPP President, Mr. Ben worked various aspects of developmental technology for biomass and gasification.
WASTE TO ENERGY & GASIFICATION R&D 1990
WPP President Mr. Ben, traveled to India for FAO in 1990 and evaluated conversion of agricultural wastes to fuels. In 1992 Mr. Ben traveled to China for the Rockefeller Foundation to evaluate two new gasifiers built there.
W2E & GASIFICATION R&D 1996
WPP President Mr. Ben, travelled around the world, visiting various gasification sites, gathering information for the book “Survey of Biomass Gasification.
BIOMASS POWER PLANT RESEARCH AND DEVELOPMENT 1997
WPP President Mr. Ben, and his engineering team started the first prototype of a 1 Mega Watt per hour Biomass Plant in Chandpur near New Delhi the testing of the smallest unit that produced 24MW power generation per day that could power a small village with great success.
BIOMASS POWER PLANT DEPLOYMENT IN GHANA, AFRICA 1998
WPP President Mr. Ben’s team in conjunction with partner CPG, deployed the first power plant in a remote village in Ghana, West Africa, which was installed successfully and commissioned using Biomass. A new power source to 24,000 homes, avoiding the cost of underground cables with great success.
EARLY R&D FOR HHO CONVERSION OF POLLUTING POWER PLANTS 1999
WPP President Mr. Ben started the first testing device that converts water into Hydrogen with proprietary science developed in Belarus. The vision was to convert large thermal power plants to reduce their operating costs and dramatically increasing efficiency by 35%. Lowering costs and increasing effeciency while running the entire power station at zero pollution, and saving huge amounts on oil and gas costs.
R&D PARTNERSHIPS FORMED WITH ADVANCED ENERGY TECHNOLOGY COMPANIES 2000
WPP President Mr. Ben and his team of engineers conducted ongoing research and development, partnering with world leaders in power generation sectors focussing on the world’s most advanced technology to reach the highest possible capacity of power production, and at the same time to reduce the cost of operations with the vision to run only clean energy sources to address global warming and to present power producers around the world with a viable solution to produce power in an environmentally friendly way, resulting in clean air for the benefit of generations to come.
WPP ENERGY PRESIDENT, MR RAFAEL BEN, INTERNATIONAL GREEN SUMMIT VIP SPEAKER 2004
In 2004 WPP President Mr. Ben became one of the world’s VIP speakers in green summits, speaking about the need to convert and upgrade power generation throughout the world to advance the use of new technologies as an alternative to the oil and gas sectors starting at Sydney Australia, Hong Kong, Cambodia, Bulgaria, Georgia, Macedonia, Crete, Greece, Saint Petersburg, and others.
BIOMASS POWER PLANTS IN NICARAGUA UPGRADED 2006/2008
From 2006-2008 WPP President Mr. Ben had power plants in Managua, Nicaragua for upgrading into Biomass plant. The conversion was to adopt new advanced Pyrolysis, combining Plasma Gasification with the Pyrolysis using tires and biomass combination to increase the amount of BTU’s converting the plants to run on a clean energy, with much higher profits on the sale of the Carbon Black, and Stainless Steel by products using the Kremsmuler exhaust system that eliminates the gases and fumes used as a second cycle, increasing power production by 18%.
WPP ENERGY CORPORATION HONG KONG OFFICIALLY FORMED 2009
2009 World Power Production Energy Corporation was formally formed (WPP Energy) to solve Municipal Solid Waste problems around the world using the advanced zero pollution technology, converting waste into power.
INNOVATIVE SOLUTION ADVANCED FOR POWER PLANTS 2010
WPP Energy introduces a revolutionary concept along with GE generators increasing power plant production by 30% and reducing operating costs by 45%.
WPP ENERGY & TECHNIP AGREE TO COLLABORATE ON FUTURE MOROCCO PROJECTS VALUED AT $50B USD 2011
WPP collaborated with Technip (a leader in Oil & Gas) for a total investment of $50 Billion USD for mega projects in Morocco
FIRST JOINT VENTURE WITH KEY WPP GOVERNMENT PROJECTS PARTNER INEWCORP 2012
WPP Formed a Joint Venture with INEWCORP to implement waste to energy projects in 15 countries in Africa for waste to energy, and green villages with a signed PPA’s with federal government in the SUM of $55 Billion USD for 35 years contract back by a signed Government DECREE.
$9.4B JOINT VENTURE AGREEMENT WITH GDTC 2013
WPP Formed a Joint Venture Agreement with GDTC for a Large Waste to Energy Projects totalling $9.4 Billion USD.
JOINT VENTURE AGREEMENT IN SOUTH KOREA FOR HOMEOWNER HHO SOLUTION 2014
WPP expanded its Far East presence by signing a Joint Venture Agreement with South Korea to convert water into Hydrogen, building the first Home Unit to provide Low Cost Heat, Hot Water, and Electricity to Home Owners.
WPP INTRODUCES INNOVATION SOLUTION FOR WATER PURIFICATION 2015
WPP deploys technology for the desalinization/purification of water. The quality of drinking water is a powerful environmental determinant of health.
WPP ANALYZES BLOCKCHAIN TECHNOLOGY 2016
WPP Energy begins to visualize the potential of block chain technology once applied to the power production industry and concludes it is the ideal way to reduce public power costs dramatically.
INTERNATIONAL GREEN SUMMIT LECTURER 2017 (A)
WPP Energy President Mr. Rafael Ben was invited to present at the green energy summit to resolve the problem of waste heavy gases and fumes generated from the power plants via a special exhaust system built in Austria that eliminates heavy pollution, and reuses the same gases and fumes with power production increased by 18% with zero pollution.
35 YEAR LONG TERM AFRICAN CONTRACT 2017 (B)
WPP ENERGY signed 35 year contracts in Africa for waste to energy projects at the Federal Government level. This encompasses over 10,000 metric tons per day of Municipal Solid Waste (MSW). Each of 5 Power Plants will process 2000 Metric Tons of MSW Per Day converting waste into power and by-products. WPP ENERGY has simultaneously secured a government Power Purchase Agreement (PPA) to consume the energy produced at 14.5 cents per kilo watt. In addition a 35 year agreement is in place for gate/tipping fees of $35 per metric ton. Contract includes yearly increases in the per kilowatt price and in the gate/tipping fees.
WPP JOINT VENTURE WITH DAHIR INSAAT JANURARY 2018
WPP signs agreement with Dahir Insaat to bring to market Green City, Vertical Greenhouse Agricultural Towers.
ICO WEBSITE CONSTRUCTED JANUARY/MARCH 2018
WPP Commences development of its comprehensive ICO website.
SWISS ENTITY FORMED, WPP ENERGY GmbH 2018
Switzerland HQ & entity formed, WPP ENERGY GmbH, to provide the best legislative landscape to support the ICO launch.
WPPCOIN WEBSITE & PRE ICO LAUNCH May 1
WPP Launches PRE ICO website and pre ICO sales begin.
GREEN ENERGY DIGITAL PLATFORM May 2 2018
WPP commences development of the Green Energy Platform.
PRE ICO SALE ENDS June 1 2018
Pre ICO sale ends.
ICO BEGINS June 2 2018
ICO begins.
ICO ENDS July 2 2018
ICO ends.
GREEN ENERGY DIGITAL PLATFORM July 2018
WPP completes development of the Green Energy Platform.
ENERGY CRYPTOCURRENCY EXCHANGE PLATFORM July 2018
WPP commences development of Energy Cryptocurrency Exchange Platform.
ENERGY CRYPTOCURRENCY EXCHANGE PLATFORM August/September 2018
WPP completes development of Energy Cryptocurrency Exchange Platform in late August to September 2018.
WPP ENERGY MOBILE APP & WALLET September 2018
Deployment WPP App & Wallet in September 2018.
FIRST HHO POWER PLANT CONVERSION TEST DEPLOYMENT November 2018
HHO Polluting Power Plant Conversion starts testing in Greece.
EXPANSION OF THE ENERGY CRYPTOCURRENCY EXCHANGE PLATFORM DECEMBER 2018
WPP undertakes a substantial expansion in the scope of its Energy Cryptocurrency Exchange Platform.
HHO FOR HOME OWNERS PREPARES FOR MARKET DELIVERY April 2019
WPP HHO technology enters final development stages for residential home deployment (up to 400 Square Meters) providing Hot Water, Heating and complete power supply.
MAJOR RUSSIAN HYDRO ENERGY PROJECTS, IN PARTNERSHIP WITH AEG August 2019
Construction of a new 90MW per hour Basin Hydro Project in Adygeja, Russia consisting of 3 turbines, a 140m investment to be recovered in two years and lucrative after two years as production cost is just 3 cents per KW. This project is to be followed by a separate a 450MW initiative. These two projects are a Joint Venture with AEG Industrial Engineering.
HHO POWER PLANT CONVERSION EXPANDS INTO TURKEY October 2019
HHO Conversion of existing Gas Steam fired power plants in Turkey. Specifially a 1000 MW power plant conversion test for a three month period. WPP has laid the groundwork for a long term signed contract Turkish authorities under a partnership agreement to convert all their gas and coal power plants to HHO. The agreement seeks full recognition of WPPCOIN to be traded within the Turkish region.
MOBILE HHO POWERSTATION FOR CRYPTOCURRENCY MINERS December 2019
WPP to be recognized as the world’s preferred power source for Crypto Mining through the success of its Mobile Power Station.
COMMENCEMENT OF AFRICAN CONTRACT DELIVERABLES April 2020
WPP will start its Waste to Energy Power Plant projects in DRC Congo and its Municipal Solid Waste Power Plant projects.
COMMENCEMENT OF MOROCCAN CONTRACT DELIVERABLES September 2020
WPP will start fie projects of Waste to Energy power plants in Morocco consisting of 10,000 Metric Tons of Municipal Solid Waste, generating total of 1000 MW power per hour.

Team

Rafael Ben/ Chairman & president
Robert Kohn/ Chief Financial Officer
Troy MacDonald/ Chief Operating Officer
Natour Ahmad Zuhir/ Chief Executive, Middle East & North Africa
J. Thomas Morrow/ Senior Vice President
Jean Pierre Dube/ Senior Waste to Energy Engineer
Ziao Dramane/ Senior Waste to Energy Engineer
Mentor Shala/ UI/UX designer

Advisors

Heinrich W. Otterpoh/ CEO of AEG industrial engineering
Ms. Aikaterini Liano/ M.SC. finansial advisor
Mr. Mehmet Durmaz/ BSCEE. nano electrical engineering advisor
Rafael Collantes/ Founder and C.E.O., Cesinel group
Carlos Barcala/ Senior Firmware Engineer
Jose Benito Castro/ Senior Hardware Designer Engineer, Power Electroni.
Javier Moreno Garcia/ Firmware / Software Engineer
Junyeol Seo/ WTE Mokpo Co., Ltd. President
Haegyu Choi/ WTE Mokpo Co., Ltd. Vice President
Sugil Kwon/ WTE Mokpo Co., Ltd. Director
Chankyun Park/ WTE Mokpo Co., Ltd. Director
Author: Wong linglong3
ETH Address: 0x29AF24D027E5A0A74427A2A4D5dDFe09803D5F93

Tidak ada komentar:

Posting Komentar